Uline Distribution Center

Market: Commercial
Region: Nevada

Design Build Fire Alarm System in 900,000+ S.F. warehouse. Briggs Systems Division did full installation with Programming provided by Summit / ABC Fire. In the core construction we provided complete electrical infrastructure, i.e. power distribution, branch electrical, lighting, dock controllers, conveyor power and data, parking lot lighting and fire alarm.

  • Delivery Method: Design-Build & Design-Assist
  • Key Elements: System integrated to the HVAC / BMS System.
  • Location: Reno, Nevada
Uline Distribution Center
Menu